• Induction Furnace Melting Iron Scrap for CCM 45 ° Hydraulic Shears
  • Induction Furnace Melting Iron Scrap for CCM 45 ° Hydraulic Shears
  • Induction Furnace Melting Iron Scrap for CCM 45 ° Hydraulic Shears
  • Induction Furnace Melting Iron Scrap for CCM 45 ° Hydraulic Shears
  • Induction Furnace Melting Iron Scrap for CCM 45 ° Hydraulic Shears
  • Induction Furnace Melting Iron Scrap for CCM 45 ° Hydraulic Shears

Induction Furnace Melting Iron Scrap for CCM 45 ° Hydraulic Shears

After-sales Service: 24 Hours
Warranty: 1
Customized: Customized
Condition: New
Power Source: Gas
Automatic Grade: Automatic
Customization:
Gold Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
YCKJ-CCM
Type
Steel-Making Equipment
Certification
ISO
Nominal Pressure
4000kn
Shear Size
165×80×40
Railway Size
165×80×40
Energy Accumulator
100L
Transport Package
Box
Specification
alloy steel
Trademark
Yachuang Technology
Origin
China
HS Code
8454309000
Production Capacity
90 Pieces /Year

Product Description

Technical features and process parameters

.Technical features:

1.The racks and cylinder are both with internal water cooling, increasing the life of the blades and seals.

2.Four edges of the blade can be rotated , increase the usage rate of the blade (about 50 to 80 thousand times per blade)

3.Due to adopting  PLC programmable controller control , the system works stably and reliably.

4.Adopt automatic sizing shearing device; Flat shear (diagonal shearing, tiny head, convenient for rolling mill), small size error.

1.The temperature of billet is controlled above 800 degrees,normal shear section: 80 x 80mm ~ 180 x 180mm

2. The shear cylinder diameter:560mm;Instantaneous shearing time:3s

3. Expansion stroke:310mm;Minimum strand distance of continuous casting machine:1200mm

4. The power of pump set:37KW(A dual-use equipment )

  Costs comparison between traditional flame cutting (including manual cutting) and hydraulic shear :

NO.

expense

flame cutting

(including manual

cutting)

hydraulic shear

remarks

1

kerf

4~6mm

Nothing

 

2

fuel

Oxygen and

acetylene

hydraulic fluid

hydraulic fluid can be circularly used,ignorant to most of it

3

Consumable

Supplies

 

 

cutting nozzle and flame cutting torch

Blade

50 to 80 thousand times per blade,ignorant to most of it

4

 labour force

 hand-cut and Slag removal

   

5

 CaloricExpenditure

Cutting time:20S~25S

Cutting time:3S~5S

 

 

 Induction Furnace Melting Iron Scrap for CCM 45 ° Hydraulic ShearsInduction Furnace Melting Iron Scrap for CCM 45 ° Hydraulic ShearsInduction Furnace Melting Iron Scrap for CCM 45 ° Hydraulic ShearsInduction Furnace Melting Iron Scrap for CCM 45 ° Hydraulic ShearsInduction Furnace Melting Iron Scrap for CCM 45 ° Hydraulic Shears

 

 

1. According to the comparison between traditional flame cutting (including manual cutting) and hydraulic shear, in the case of heat consumption,theuse of hydraulic shear saves about ¥5-¥8 per ton.

2. Cost savings of using the hydraulic shears for each continuous casting machine per month:(25t/h*16h/d*28d/month*5yuan/t=56,000.00yuan)

3. The time to recover the cost of hydraulic shear:4 month

(56,000.00yuan/month*4month=224,000.00yuan)

4.Suggestion:If the factory have used continuous casting and rolling project,it had batter use hydraulic shear.Reason:(it will save 18s after usinghydraulic shear,the billet temperature is higher ,Increase the yield, reduce the loss of mill equipment, save power.   ) 

Induction Furnace Melting Iron Scrap for CCM 45 ° Hydraulic Shears

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now