Dedusting Project 20 Tons Intermediate Frequency Induction Furnace Steelmaking Melting Scrap

Product Details
Customization: Available
Certification: ISO
Installation
Method:
Factory Install
Gold Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
6000000 RMB
Plant Area
>2000 square meters
  • Dedusting Project 20 Tons Intermediate Frequency Induction Furnace Steelmaking Melting Scrap
  • Dedusting Project 20 Tons Intermediate Frequency Induction Furnace Steelmaking Melting Scrap
  • Dedusting Project 20 Tons Intermediate Frequency Induction Furnace Steelmaking Melting Scrap
  • Dedusting Project 20 Tons Intermediate Frequency Induction Furnace Steelmaking Melting Scrap
  • Dedusting Project 20 Tons Intermediate Frequency Induction Furnace Steelmaking Melting Scrap
  • Dedusting Project 20 Tons Intermediate Frequency Induction Furnace Steelmaking Melting Scrap
Find Similar Products

Basic Info.

Model NO.
YCKJ_ dedusting
Operation
Type
Automatic
Medium Material
Chemical Synthetic Fiber
Dust Collecting Method
Dry
Type
Granular Layer Dust Collector
Transport Package
Container
Specification
Q235 or 304SS
Trademark
Yachuang Technology
Origin
Fuzhou Fujian
HS Code
8454309000
Production Capacity
20pieces /Year

Product Description

Profile,design principles and index
Profiles
No. Name Parameter
1 Smelting equipment Induction furnace
2 Capacity 30T
3 Quantity 3 sets

Dedusting Project 20 Tons Intermediate Frequency Induction Furnace Steelmaking Melting Scrap
Design index
                                                 
Table 1
No Item Unit Design index Index or policy
Index Policy
  1.  
Dust capture rate % ≥95   There is no yellow smoke outside the roof
  1.  
Amount of dust collecting kg/T ≥10    
  1.  
Emission mg/Nm3 25 <50  
  1.  
Collection efficiency % >95    
  1.  
Job dust mg/m3 <10 <10 Hygienic Standards for the Design of Industrial Enterprises
Dedusting system's technical process and solution
Dust capture method
Dedusting method for 30T induction furnace:Mobile semi-airtight housing.
3×30T induction furnaces share a set of dedusting system,and adjust the air distribution at each point through the valves on their respective pipelines.
Process flow
After the flue gas from the feed inlet of induction furnace is collected by the dust hood and passes through the adjusted butterfly valve. The dust enters the bag filter through the dust collecting pipe. At this time, the large particles in the dust are separated by the dust collector by gravity. The large particles enter the dust hopper of the dust collector and the fine particles enter the bag filter. The dust adhered to the surface of the bag is concentrated in the dust hopper of the dust collector through the filter bag filtration and pulse blowing. The dust is recovered or utilized by the controller. The clean air after being treated by the bag filter is discharged through the draught fan. Finally, it is discharged into the atmosphere through the chimney. The dust collected by the bag filter is discharged through the flap valve. The system process is as follows:
Dedusting Project 20 Tons Intermediate Frequency Induction Furnace Steelmaking Melting Scrap

The induction furnace dust removal system consists of dust hood, air duct, electronic valve, mixed valve, bag filter, draught fan, chimney and electrical control system. After the smoke and dust from the intermediate frequency furnace were generated by the dust hood, they enter the dust collector through the adjusted butterfly valve and the air inlet pipe ,to collect large particles and play a role of flame retardance. Then, the dust is trapped outside the filter bag by the pulse bag type dust collector. Finally,the dust collected by the dust collector and the bagged dust collector is recycled through the swing valve.
Air volume determination and distribution
For 30T induction furnace
Table 2
No Item Unit 30T induction furnace
1 Quantity Set 3
2 Capture method
method
 
  Semi-airtight housing
3 System exhaust capacity m3/h 500000
4 System resistance Pa 4200
5 Velocity in the pipeline M/s 16-19
6 Main air blower   Y4 -73No.27D /730 rpm
7 Main drive motor   Y560L1-8/800KW/10V
8 Blower startup   Frequency converter 800KW/10KV
9 Filter area M2 6500
10 Filtration velocity M/min ~1.3
11 Pressure of compressed air MPa >=0.4
12 Compressed air consumption NM3/min 4
13 Main pipe diameter mm Φ3200
14  Chimney diameter×H mm×m Φ4000×2

Dedusting Project 20 Tons Intermediate Frequency Induction Furnace Steelmaking Melting Scrap
Dedusting Project 20 Tons Intermediate Frequency Induction Furnace Steelmaking Melting Scrap

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier